翻訳と辞書
Words near each other
・ Montague Miller
・ Montague Modlyn
・ Montague Muir Mackenzie
・ Montague Napier
・ Montague North
・ Montague Nuclear Power Plant
・ Montague railway station
・ Montague Redgrave
・ Montague Regional High School
・ Montague Road
・ Montague Road, Adelaide
・ Montague Scott
・ Montague Shadworth Seymour Moore
・ Montague Shearman
・ Montague Street
Montague Street Tunnel
・ Montague Sturt
・ Montague Summers
・ Montague Thomas Robson Younger
・ Montague Township
・ Montague Township School District
・ Montague Township, Michigan
・ Montague Township, New Jersey
・ Montague Tyrwhitt-Drake
・ Montague Ullman
・ Montague Waldegrave, 5th Baron Radstock
・ Montague White
・ Montague Williamson
・ Montague Wilmot
・ Montague Woodhouse, 5th Baron Terrington


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Montague Street Tunnel : ウィキペディア英語版
Montague Street Tunnel
__NOTOC__
The Montague Street Tunnel carries the of the New York City Subway under the East River between the boroughs of Manhattan and Brooklyn.
==History==

Construction of the tunnel began on October 12, 1914, using a tunneling shield in conjunction with compressed air. The tunnel was designed by civil engineer Clifford Milburn Holland, who would later serve as the first chief engineer of the Holland Tunnel. The north tube of the tunnel was holed through on June 2, 1917, and the south tube was holed through on June 20, 1917.〔(【引用サイトリンク】title=Last Down-town Tunnel Holed Through )
It opened to revenue service on August 1, 1920, the same day as the 60th Street Tunnel, on a holiday schedule; regular service began the next day. The two new tunnels allowed passengers to make an trip from Coney Island, through Manhattan on the BMT Broadway Line, to Queens for a 5-cent fare. The original construction cost was $9,867,906.52, almost twice that of the 60th Street Tunnel.
On December 27, 1920, more than ten thousand passengers were forced to evacuate the tunnel. Power to the third rail was shut off after a shoe beam on a train approaching Whitehall Street fell and caused a short circuit, stranding ten subway trains inside the tunnel.
On October 29, 2012, the tunnel suffered severe flooding from Hurricane Sandy. As a result, the tunnel was closed to all train service while repairs were being made. Service in the tunnel was restored using temporary equipment on December 21. However, the MTA had announced that a complete reconstruction of the tunnel systems was needed, so the tunnel was closed for a second time on August 2, 2013.〔http://web.mta.info/nyct/service/R_14monthMontagueTunnelClosure.htm〕 Originally slated to open by October 2014, it reopened a month early on September 14, 2014.〔http://www.brooklyndaily.com/stories/2014/37/br-montague-tube-opens-early-2014-09-12-bk_2014_37.html〕〔http://www.myfoxny.com/story/26524643/sandy-damaged-nyc-subway-tunnel-to-be-reopened〕